Project
Managers Status Reports.
|
|
|
3/4/01 Progress Report Week End #9
Everything is looking good so far. We released R3 to the customer on
Friday with zero known bugs. All features have been implemented with the
exception of Find. There was not enough time to do it. I feel very confident
about this release, as we have been doing much better than for the second
one. I have kept us on track for the most part and made sure that we do
not get behind schedule very much. Now all that is left to be done is
compile all of our documents to be turned in on Tuesday, and make sure
all pages on the web are updated. We will go over all this on our Monday
night meeting, as well as go over the Release 3 Checklist to make sure
that we do not forget anything and that we are thoroughly prepared for
the final release on Tuesday.
3/4/01 Progress Report Week End #8
We have made some good progress on our coding this week, and I feel our
program will be in good shape soon. All functionality must be done by
Sunday so we can start testing. We are still a day behind, as Find is
not done yet. All other functionality, such as binary file, delete key,
and the help system have been implemented. I see improvements in out coding,
as most of us have been accomplishing a lot without relying on the help
of Chris. This allows Chris to work on his own modules with fewer interruptions.
Our scheduled coding sessions have saved the team, in my opinion. We work
much better when we are all together than when we code individually at
home. Scheduling conflicts have been a problem for a few team members
though.
We are lacking on our testing. We have our testcases documented, although
nothing has been automated yet. We were having problems getting JUnit
to work properly. Our visibility has been updated through the week's end,
so once we pick up a few loose ends, we will be able to enter testing
mode.
2/25/01 Progress Report Week End #7
We have finally sent out Release 2 and got it back with some problems.
With new job assignments, we all discussed our strengths and weaknesses.
To keep us on schedule, I have set up 3 team coding sessions a week to
keep team momentum going forward. All of us need to improve our coding
skills, because we cannot rely on Chris as a 'hero'. We have recalibrated
our estimates based on the visibility from release 2 and have determined
that we can produce about 200 lines of code for release #3. We are a few
days behind schedule as we have found that some of the coding is tougher
than we expected.
2/8/01 Progress Report # 3
We have completed about 90% of our web page updating, but have hit the
90/90 problem and are currently about 3 days behind schedule. We plan
on delivering our release 2 to George tonight or tomorrow. We received
one anonymous feedback suggesting that we move our anonymous feedback
channel be moved to the bottom of our website which we are currently doing.
We have hit some of our mini milestones but still had some incomplete
action items that need to be taken care of. A meeting is going to be set
this weekend to hopefuly catch up a little to get back on schedule.
2/1/01 Progress Report # 2
Our web page needs updating, but most documents exist on paper and just
need to be posted. We have walked through 3 of the 6 features we are implementing
for this release. We set two meetings for this weekend to hopefully complete
all the walkthroughs and as much of the testing as possible. Right now,
we are about 1-2 days behind schedule and hope to make up that time this
weekend. We set up Dreamweaver for web page updating and I essentially
assigned the entire web site and all of its components as an Action Item
to be completed by 2/2/01 at 8pm. Each person has about 3 documents they
are responsible for that either need to be updated or completed.
1/25/01 Progress Report # 1
So far we are on schedule, and have not discovered any defects except
the residuals on the toolbar. We have completed all mini milestones, and
have received no feedback from our anonymous feedback channel. We need
to update our visibility and schedule, but have got our cvs online. Finished
corrections to release one components as well as about 10 other documents
on the web page.
3/6/01 Updated
Week 8 report, Tony Tomarchio
2/27/01 Updated Week 7 report, Tony Tomarchio
02/08/01 Moved Time Logs to separate link
02/08/01 Added this weeks rpt.
02/05/01
Updated TimeLog, Tony Johansen
02/01/01
Current Time Log Added, Tony Johansen
|