CHANGE CONTROL PLAN
Work Product Change Control Summary
Work Product
|
Administered By
|
Document Location
|
Change Procedure
|
Change
Control Plan |
Anthony
Tomarchio
|
Web
Page
|
Single
Author
|
Change
Proposals |
Anthony
Tomarchio
|
Web
Page
|
Formal
Change
|
Vision
Statement |
Ben
Hill
|
Web
Page
|
Single
Author
|
Top
10 Risks List |
Albert
Lee
|
Web
Page
|
Single
Author
|
Software
Development Plan, including project estimates |
Ben
Hill
|
Web
Page
|
Single
Author
|
UI
Prototype |
N/A
|
N/A
|
N/A
|
UI
Style Guide |
N/A
|
N/A
|
N/A
|
User
Manual |
Albert
Lee
|
Cobra
Server
|
Formal
Change
|
QA
Plan |
Tony
Johansen
|
Web
Page
|
Single
Author
|
Software
Architecture |
John
Pham
|
N/A
|
Formal
Change
|
Integration
Procedure |
Chris
Perluss
|
Web
Page
|
Single
Author
|
Staged
Delivery Plan |
Chris
Perluss
|
Web
Page
|
Single
Author
|
Coding
Standard |
Tony
Johansen
|
Web
Page
|
Single
Author
|
Test
Cases |
Cliff
Rowley
|
Cobra
Server
|
Single
Author
|
Source
Code |
Anthony
Tomarchio
|
Cobra
Server
|
Multi
Author
|
Icons/Graphics/etc |
Albert
Lee
|
Cobra
Server
|
Multi
Author
|
Detailed
Design Document |
TBD
|
TBD
|
TBD
|
Build
Procedure |
Chris
Perluss
|
Web
Page
|
Single
Author
|
Construction
Plan |
TBD
|
TBD
|
TBD
|
Release
Checklist |
Tony
Johansen
|
Web
Page
|
Single
Author
|
Release
Sign Off Form |
TBD
|
TBD
|
TBD
|
Team
Status Reports |
Ben
Hill
|
Web
Page
|
Single
Author
|
Team
Meeting Notes |
Ben
Hill
|
Web
Page
|
Single
Author
|
Detailed
Schedule |
Ben
Hill
|
Web
Page
|
Single
Author
|
Training
Plan |
Albert
Lee
|
Web
Page
|
Single
Author
|
Web
Site Management |
Anthony
Tomarchio
|
Quartzware
Server
|
Dreamweaver
|
Test
Matrix |
Tony
Johansen
|
Web
Page
|
Single
Author
|
Email
Server |
Anthony
Tomarchio
|
QW
Email Server
|
N/A
|
Change
Control Procedures
Single
Author - A document with this procedure will be updated when
necessary. The administrator
of this document may update the document at any time needed. Changes made will be written at the bottom
in a change summary. If
others need to make changes to this document, they must contact
the administrator, who will then make the changes. If this document
is stored on the web page, then see the procedure labeled "Dreamweaver"
Multi
Author - The tool of choice for this procedure will be CVS. This mainly applies to source code, which
will be updated by all team members. CVS takes care of documenting the changes made to a document.
Dreamweaver
- This procedure applies to the team web site. When necessary changes are made to documents
and they are to be posted on the site, team members must follow
the web procedure, which is linked from the team web site. If
a new page is to be created, team members must contact the web
administrator.
Formal
Change - Whenever someone determines that some aspect of an
accepted work product should be changed, then he/she is to submit
a change proposal request to the Change Control Board via Formal
Change Request Form, which is linked below.
Once
a change proposal has been submitted to the Change Control Board,
the change proposal is given to the administrator of the work
product or the person who may be impacted by the change. These
parties are responsible for producing an estimate of the effects
of implementing the proposed change.
The
Change Control Board will then assess the following:
-
Additional
management effort to revise the schedule and notify affected
parties
-
The
distraction of the affected parties from their primary work
while they assess the impact of the proposed change
-
Impact
on the user manual
-
Impact on on-line help
-
Impact
on product specifications
-
Impact
on product design documents
-
Impact
on product source code
-
Impact
on product test procedures and source code
-
Impact on installation program or procedures
-
Impact
on training materials (including tutorial program, if any)
-
The
general tendency of quality to degrade with change
-
The
dramatically increased cost of change at later stages of the
project
Once
the impact of the proposed change to each area is assessed, the
Change Control Board must make a decision whether to accept or reject
the proposed change. The Change Control Board may reject a proposed
change out-of-hand if it determines that the cost of formally assessing
the impact of the change outweighs its perceived benefit. Since
defects are treated like all other change requests, the Change Control
Board selects for correction only those defects which represent
an acceptable benefit/risk trade-off based on the phase of the project
and the distance from the next important milestone.
If
accepted, the assessed impact on the development schedule must be
incorporated into the existing schedule and a new schedule produced.
If the Change Control Board deems it necessary, trade-offs between
time, function, and manpower may be made in an attempt to mitigate
the effects of change to the existing schedule. However, in no circumstances
will changes be approved without sufficient consideration of their
associated schedule implications.
Regardless
of whether a change is approved or rejected, the following information
is recorded by the defect tracking system and made available to
the party submitting the change proposal (and any other interested
parties that desire to monitor the progress of the work product):
- The
date, description, and party submitting the proposed change.
- The
estimated impact of the change on the development areas listed
above.
- The
date when the change was accepted, rejected, or deferred.
- If
accepted, the overall impact on the project schedule (which includes
the effects of any mitigating strategies and their descriptions).
- If
rejected, the reason for rejection.
The
Change Control Board for this project will consist of all team members.
For any given request, the Board leader will be the administrator
of the work product in question. All decisions will be documented
on the web site.
Formal
Change Request Form
An
automated HTML form will be posted on the site, which allows developers
to suggest changes at any time.
The form will contain the area of the change or issue,
who is responsible for it, etc.
All completed requests will also be posted on the web once
completed. Click Here
Submitted
Change Requests
All
submitted requests will be logged on the web page. Once a week, the change request list will
be updated on the web page. When a decision has been made, the
admin for the document will be notified, and he is responsible
for making the changes.
Version History:
2/1/01 - Procedures updated and items added to work product list,
Anthony Tomarchio
2/8/01 - Formal Change procedure Added, Anthony Tomarchio
2/13/01 - Updated request form and submitted sections, Anthony Tomarchio
|