CHANGE CONTROL PLAN

 

Work Product Change Control Summary

Work Product

Administered By

Document Location

Change Procedure

Change Control Plan
Anthony Tomarchio
Web Page
Single Author
Change Proposals
Anthony Tomarchio
Web Page
Formal Change
Vision Statement
Ben Hill
Web Page
Single Author
Top 10 Risks List
Albert Lee
Web Page
Single Author
Software Development Plan, including project estimates
Ben Hill
Web Page
Single Author
UI Prototype
N/A
N/A
N/A
UI Style Guide
N/A
N/A
N/A
User Manual
Albert Lee
Cobra Server
Formal Change
QA Plan
Tony Johansen
Web Page
Single Author
Software Architecture
John Pham
N/A
Formal Change
Integration Procedure
Chris Perluss
Web Page
Single Author
Staged Delivery Plan
Chris Perluss
Web Page
Single Author
Coding Standard
Tony Johansen
Web Page
Single Author
Test Cases
Cliff Rowley
Cobra Server
Single Author
Source Code
Anthony Tomarchio
Cobra Server
Multi Author
Icons/Graphics/etc
Albert Lee
Cobra Server
Multi Author
Detailed Design Document
TBD
TBD
TBD
Build Procedure
Chris Perluss
Web Page
Single Author
Construction Plan
TBD
TBD
TBD
Release Checklist
Tony Johansen
Web Page
Single Author
Release Sign Off Form
TBD
TBD
TBD
Team Status Reports
Ben Hill
Web Page
Single Author
Team Meeting Notes
Ben Hill
Web Page
Single Author
Detailed Schedule
Ben Hill
Web Page
Single Author
Training Plan
Albert Lee
Web Page
Single Author
Web Site Management
Anthony Tomarchio
Quartzware Server
Dreamweaver
Test Matrix
Tony Johansen
Web Page
Single Author
Email Server
Anthony Tomarchio
QW Email Server
N/A

 

Change Control Procedures

Single Author - A document with this procedure will be updated when necessary.  The administrator of this document may update the document at any time needed.  Changes made will be written at the bottom in a change summary.  If others need to make changes to this document, they must contact the administrator, who will then make the changes. If this document is stored on the web page, then see the procedure labeled "Dreamweaver"

Multi Author - The tool of choice for this procedure will be CVS.  This mainly applies to source code, which will be updated by all team members.  CVS takes care of documenting the changes made to a document.

Dreamweaver - This procedure applies to the team web site.  When necessary changes are made to documents and they are to be posted on the site, team members must follow the web procedure, which is linked from the team web site. If a new page is to be created, team members must contact the web administrator.

Formal Change - Whenever someone determines that some aspect of an accepted work product should be changed, then he/she is to submit a change proposal request to the Change Control Board via Formal Change Request Form, which is linked below.

Once a change proposal has been submitted to the Change Control Board, the change proposal is given to the administrator of the work product or the person who may be impacted by the change. These parties are responsible for producing an estimate of the effects of implementing the proposed change.

The Change Control Board will then assess the following:

  • Additional management effort to revise the schedule and notify affected parties
  • The distraction of the affected parties from their primary work while they assess the impact of the proposed change
  • Impact on the user manual
  • Impact on on-line help
  • Impact on product specifications
  • Impact on product design documents
  • Impact on product source code
  • Impact on product test procedures and source code
  • Impact on installation program or procedures
  • Impact on training materials (including tutorial program, if any)
  • The general tendency of quality to degrade with change
  • The dramatically increased cost of change at later stages of the project

Once the impact of the proposed change to each area is assessed, the Change Control Board must make a decision whether to accept or reject the proposed change. The Change Control Board may reject a proposed change out-of-hand if it determines that the cost of formally assessing the impact of the change outweighs its perceived benefit. Since defects are treated like all other change requests, the Change Control Board selects for correction only those defects which represent an acceptable benefit/risk trade-off based on the phase of the project and the distance from the next important milestone.

If accepted, the assessed impact on the development schedule must be incorporated into the existing schedule and a new schedule produced. If the Change Control Board deems it necessary, trade-offs between time, function, and manpower may be made in an attempt to mitigate the effects of change to the existing schedule. However, in no circumstances will changes be approved without sufficient consideration of their associated schedule implications.

Regardless of whether a change is approved or rejected, the following information is recorded by the defect tracking system and made available to the party submitting the change proposal (and any other interested parties that desire to monitor the progress of the work product):

  • The date, description, and party submitting the proposed change.
  • The estimated impact of the change on the development areas listed above.
  • The date when the change was accepted, rejected, or deferred.
  • If accepted, the overall impact on the project schedule (which includes the effects of any mitigating strategies and their descriptions).
  • If rejected, the reason for rejection.

The Change Control Board for this project will consist of all team members. For any given request, the Board leader will be the administrator of the work product in question. All decisions will be documented on the web site.

Formal Change Request Form

An automated HTML form will be posted on the site, which allows developers to suggest changes at any time.  The form will contain the area of the change or issue, who is responsible for it, etc.  All completed requests will also be posted on the web once completed. Click Here

Submitted Change Requests

All submitted requests will be logged on the web page.  Once a week, the change request list will be updated on the web page. When a decision has been made, the admin for the document will be notified, and he is responsible for making the changes.

 

Version History:
2/1/01 - Procedures updated and items added to work product list, Anthony Tomarchio
2/8/01 - Formal Change procedure Added, Anthony Tomarchio
2/13/01 - Updated request form and submitted sections, Anthony Tomarchio

 

 