| Release Checklist | | | Engineering Activities:
- Remove debugging and testing code from the
software.
- Verify proper documentation of code
library and that code follows the Coding
Standard.
Quality Assurance Activities: - Check that all defects on current defect list have been resolved.
- Smoke test/regression test final build.
- Link final build on web site.
- Download final build from web site.
- Run final build on clean machine.
Release
Activities:
- Freeze
final list of files to be distributed.
- Synchronize
date/timestamp on all release files.
- Verify
all files are present in distribution package.
- Create Installation program (Final Release
only).
Documentation
Activities:
- Verify User Manual is consistent with the
current build.
- Link end-user
documentationn web site
- Verify
version of documents on website is consistent with the current build.
- Verify
version of help files included in the distribution package is consistent
with the current build.
Other
Activities:
- Include
IBM License Copyright text.
02/14/01 Engineering
Activites, Release Actvities, Documentation Activites and Other Activites
Added, John Pham
02/01/01 Q.A. Activities Added, Tony Johansen |