QuartzWare Logo






Subscribe To The Newsletter
"Timeless Software Solutions"
Team Planning Tracking Technical Deliverables Contact

Release Checklist

 

Engineering Activities:

  • Remove debugging and testing code from the software.
  • Verify proper documentation of code library and that code follows the Coding Standard.

Quality Assurance Activities:

  • Check that all defects on current defect list have been resolved.
  • Smoke test/regression test final build.
  • Link final build on web site.
  • Download final build from web site.
  • Run final build on clean machine.

Release Activities:

  • Freeze final list of files to be distributed.
  • Synchronize date/timestamp on all release files.
  • Verify all files are present in distribution package.
  • Create Installation program (Final Release only).

Documentation Activities:

  • Verify User Manual is consistent with the current build.
  • Link end-user documentationn web site
  • Verify version of documents on website is consistent with the current build.
  • Verify version of help files included in the distribution package is consistent with the current build.

Other Activities:

  • Include IBM License Copyright text.

 

02/14/01 Engineering Activites, Release Actvities, Documentation Activites and Other Activites Added, John Pham
02/01/01 Q.A. Activities Added, Tony Johansen

| home | team | planning | tracking | technical | deliverables | contact |

Copyright (c) 2000 QuartzWare. All rights reserved.
Site created by Anthony Tomarchio of Teknokratz, Inc.