Detailed Schedule

Date Due Assignment Comments
Th 1/11

Handout assignments for Release 1
Project Plan - Ben
Detailed Schedule - Tony J., Albert
Lines of Code - Ben and Chris
Change Control Plan - Tony T.
Quality Assurance Plan - Tony J.

Completed
Tu 1/16 Rough Drafts Of Documents Due
Training Plan - Albert
Completed
Th 1/18

Stage 1 Release Date
Assign Release 2 modules

Completed
Tu 1/23 Current Action Items - Ben
Training Plan Team - Al
Meeting Notes - Ben
Staged Delivery Plan - Al, Chris
Integration Plan - Chris
Detailed Schedule - Ben, Tony J
Completed
Th 1/25

PSP Submission Procedure - Tony J
Time Act. Procedure - Ben
Requirements Traceability - John
Visibility - Tony T
Unit Developer Procedure - Cliff
Build Procedure - Chris
Build Report - Chris

Completed
Tu 1/30 Modules coded
New Project - John
Open Project - Cliff
Save - Chris
Int Val - Ben
String Val - Al
New Bundle - Tony J
Close Project - Tony T
Completed
Th 2/1 Modules coded
Create New Key - John
Edit Comments/Edit Key Names - Cliff
Choice Format Test - Chris
Save Loose File - Ben
Save As - Al
Close Loose File - Tony J

Completed
Tu 2/6 Stage 2 Release must be sent to customer Complete
Th 2/8 Integral Test results
Functional PSP form for size and cost submitted for each module
Complete
Tu 2/13 Stage 2 Release Date checklist is completed Complete
Th 2/15

Escape Sequences
Find
Help System
Edit Comments/Edit Key Name/Edit Key Type Menu Open Loose File
Import Bundle (Add Child)

N.A.
Tu 2/20

Cut/Copy/Paste
View/Hide Menu
Install Program
Undo/Redo
Default Columns to show in new EditorWindows
(Pref Dlg List Keys Alphabetically (Pref Dlg)
Change Colors (Pref Dlg)
Optional: known defect list

N.A.
Th 2/22 All test cases are documented. Unit test results: Assertion testing complete N.A.
Sun 2/25

Team Coding Session:
-Save As
-Delete A Key

Update Visibility
Recalibrate Estimates and LOC

Complete
Mon 2/26 Team Coding Session and bug fixes Complete
Tu 2/27

Update Detailed Schedule:
-Code Inspections
-Unit Testing

Complete
Wed 2/28

Team Coding Session:
-Save
- Remove Bundle
-Binary File
-Find

Code Inspection:
-Project.java
(getChild, getChildCount, getRoot, isLeaf, isChild) (Tony J, Tony T, John)

Completed
Th 3/1

Code Inspection:
-PropertyIO.java (All) (Tony J, Tony T, John)

Unit Test:
-Project.java
(getChild, getChildCount, getRoot, isLeaf, isChild) (Tony J.)


Update Class Diagram
Update User Manual
Update Visibility

Completed
Sun 3/4

Team Coding Session:
-Help System
- Handle .java File

Code Inspection:
-JavaIO.java (Chris, Ben, Cliff, Albert)
-EditorWindow.java + Entry.java
(For Propagation of Keys) (Chris, Ben, Cliff, Albert)

Unit Test:
-PropertyIO.java (Cliff)
-EditorWindow.RBEditTableModel (Albert)
-EditorWindow.RBEditTableCellRenderer (Ben)
-EditorWindow.RBEditTableCellEditor (Chris)
-ResBundle.getParentEntry (John)
-JavaIO.java (Tony T.)

All specified functionality must be complete!!!

Completed
Mon 3/5 Run tests and Fix Bugs Completed
Tues 3/6 Run tests and Fix Bugs Completed
Th 3/8 Update Class Diagram
Update User Manual
Update Visibility
Completed
Fri3/9 Stage 3 Release must be sent to customer PSP form for size, cost, and quality submitted Completed
Tu 3/13 Stage 3 Release Date  
Th 3/15 Final Project Submission  

2/27/01

Updated to include Unit Test
and Inspections

Tony J
2/27/01 Updated for Release 3 Tony T
2/13/01 Made minor changes Ben
2/1/01 Updated for all releases Ben
1/23/01 Updated for 206 Ben, Tony J, Al

 

 