Current Action Items -

Assigned

Task

Who

Due

Completed

01-11

SPMP

Antony

01-15

01-14

01-11

SQAP

Josh

01-15

01-13

01-11

Integration Plan

Josh

01-15

01-15

01-11

Detailed Schedule

Kevin

01-15

01-17

01-11

CVS repository on latte and source code control procedure

Kamil

01-15

01-15

01-15

Change Control Plan

Kamil

01-17

01-17

01-15

Training Plan

Kevin

01-17

01-17

01-15

Top 10 Risks List

Sean

01-17

01-16

01-15

Download Page

Kamil

01-17

01-16

01-15

Progress Indicators

Kevin

01-17

01-17

01-17

Unit Development Procedure

Josh / Antony

01-22

01-22

01-17

Daily Build Procedure and Report

Sean

01-22

01-22

01-17

Smoke Test Procedure and Report

Sean

01-22

01-22

01-17

Time Recording Procedure

Kevin

01-22

01-23

01-22

CVS Procedure Update

Kamil

01-24

01-23

01-22

Modules for Game.class

Kamil

01-24

01-23

01-22

Modules for Game.class

Kamil

01-24

01-23

01-24

Refined Detailed Schedule with all Stage 2 mini-milestones

Kevin

01-29

01-25

01-24

Game.class modules (see Integration Plan)

Kevin

01-27

01-27

01-24

Game.class modules (see Integration Plan)

Kevin

01-28

01-28

01-24

LOC Counting Procedure

Antony

01-29

01-27

01-24

Email and Standard Report Procedure

Antony

01-29

01-27

01-24

Individual Status Report Procedure

Antony

01-29

01-27

01-24

Requirements Traceability

Josh

01-29

01-29

01-24

Updating Links on Web Page

Kamil

01-29

01-28

01-24

Game.class Modules (see Integration Plan)

Kamil

01-28

01-28

01-31

Top 10 Risks

Kamil

02-05

02-04

01-31

Sort Integration Plan by Date

Kamil

02-05

02-04

01-31

Links on Web

Kamil

02-05

02-04

01-31

Update SRS on Web

Kamil

02-05

02-04

01-31

Coding

Kamil

02-05

02-02

01-31

Add Keyboard Shortcuts

Josh

02-05

02-04

01-31

Requirement Traceability on Integration Plan

Josh

02-05

02-05

01-31

UI Menu On Integration Plan

Josh

02-05

02-05

01-31

LOC Estimates/Actual

Kevin

02-05

02-04

01-31

Detailed Schedule Update

Kevin

02-05

02-04

01-31

Test Cases for Stage 1

Antony

02-05

02-05

01-31

Test Matrix

Sean

02-05

02-04

01-31

Test Plan Update

Sean

02-05

02-05

01-31

Test cases and test scripts

Sean

02-05

02-05

01-31

Update Smoke Test Procedure

Sean

02-05

02-05

 

End of Stage 2/Beginning of Stage 3

 

 

 

02-21

Recalibrate Estimates for Stage 3

Sean

02-25

02-24

02-21

Update Current Action Items

Sean

02-25

02-25

02-21

Update Detailed Schedule

Sean

02-25

02-25

02-21

Update Project Visibility Metrics

Sean

02-25

02-25

02-21

Fix Small Web Page Link Problems

Sean

02-25

02-23

02-21

Update Project Manager Log

Sean

02-25

02-25

02-21

Update Integration Plan for Stage 3

Kevin

02-25

02-25

02-21

Update Design to accomidate new features (Level Class and SGUI)

Kevin

02-25

02-25

02-21

Update Staged Delivery Plan

Antony

02-25

02-24

02-25

Update Top 10 Risks List

Antony

02-28

03-04

02-26

Update Integration Plan Estimates

Kevin

02-28

03-04

02-26

Update Class Diagram

Kevin

02-28

03-11

02-26

Get CVS Branch Working

Antony

02-28

02-28

02-26

Recalibration for Stage 3 -- Revision

Sean

02-28

02-28

02-26

Homework

 All

02-28

02-28

02-26

Follow Integration Plan for Code Due

All Developers

03-07

03-08

02-26

Update SRS

Antony 

02-28

03-01

02-26

Write Unit Test Procedure

Josh

02-28

02-28

02-26

Link Software Inspection Procedure

 Kamil

02-28

02-28

02-26

Update LOC Counting Procedure

 Kevin

02-28

03-10

02-28

List of all new Action Items

Sean

03-05

03-05

02-28

Update Design for Robot Facing issues

Kevin

03-05

Scrubbed

02-28

Get Sleep after all action items are completed

All

03-05

03-05

02-28

Write System Tests

Kamil/Josh

03-07

03-08

02-28

Smoke Test Software

Josh

Ongoing

Ongoing

02-28

Develop All Code (Slope of code growth for last week > 90%)

All Developers

03-07

03-10

02-28

All Version Strings are Updated

All Developers

03-07

03-11

02-28

All Defects Open Have Been Removed

Kamil/Josh

03-12

03-12

02-28

Update Test Matrix

Kamil

03-11

03-11

02-28

System Test Software

Kamil/Josh

03-11

03-11

02-28

Post System Test Results

Kamil/Josh

03-11

03-11

02-28

All Mini Milestones are Complete

All

03-11

03-11

02-28

Disk With Final Version and Install Script is Created and Tested

Kamil

03-12

03-11

02-28

Check All Team Website Links Work

Kamil

03-11

03-11

02-28

Freeze Repository

Antony

03-11

03-12

02-28

Create Backup of Build

Antony

03-11

03-11

02-28

Assure All Code is Compliant to Class Coding Standard

All

03-11

03-10

02-28

Update SRS

Antony

03-11

03-09

02-28

Sign-off Sheet Signed

All

03-12

03-12

02-28

Update Download Page

Kamil

03-11

03-11

02-28

Prepare Project Metrics Documents and PSP Stuff

Kamil

03-11

03-11

02-28

All Design Documentation is Updated (Class Diagram, Javadocs, etc.)

Kevin

03-11

03-11

02-28

Release Checklist is Completed

Kamil

03-12

03-12