Action Items | |
Completed Action Items are shaded
Late Action Items are colored Red
Action Items that are still being worked on are not colored
Action items shared by whole team are colored yellow
Name | Action Items | Date Assigned | Date Due |
|
ALL | Read Chapter 18 for team meeting on Thursday | 3/13 | 3/15 | |
Phil | Create CD for final submission | 3/13 | 3/15 | |
MikeH | Email Phil directory structure / contents that will be on final CD | 3/13 | 3/14 | |
Jon | Finish writing system test scripts | 3/13 | 3/14 | |
MikeP | Create ReadMe file for final CD | 3/13 | 3/14 | |
Wes | Create one more build (to accomodate change in ETAViewAbstract constructor made in lab) | 3/13 | 3/14 | |
Phil | Add Keyboard Shortcuts section to user manual | 3/8 | 3/10 | 3/10 |
Phil | Implement cheap blinky workaround | 3/8 | 3/10 | 3/10 |
MikeH | Revise release criteria #7 | 3/8 | 3/8 | 3/8 |
MikeH | Update UI Prototype | 3/8 | 3/11 | 3/12 |
Jon | Javadoc comments for MyRobot (cancelled) | 3/8 | 3/12 | |
Jon | Update unit test procedure (add details about documenting tests) | 3/8 | 3/9 | 3/9 |
Apel | Javadoc comments for Assert (cancelled) | 3/8 | 3/12 | |
Apel | Figure out how to spawn a browser to display help file | 3/8 | 3/11 | 3/13 |
Wes | Update Staged Delivery Plan | 3/8 | 3/10 | 3/10 |
ALL | Write System Test Cases (see test matrix for who's assigned what) | 3/8 | 3/10 | 3/10 |
Phil | Research blinking defect | 3/6 | 3/7 | 3/7 |
Phil | Disable object pool buttons when not necessary (cancelled) | 3/6 | 3/8 | (cancelled) |
MikeH | Route output to status pane to log files (to assist testing) | 3/6 | 3/7 | 3/7 |
Jon | Research how long it takes to write / perform a system test case, assign system test cases to rest of group | 3/6 | 3/10 | 3/8 |
Jon | Update system test case and test matrix | 3/6 | 3/10 | 3/8 |
MikeP | Revise software inspection summaries (list defects found) | 3/6 | 3/9 | 3/9 |
MikeP | Add accelerators to menu items (to assist testing) | 3/6 | 3/7 | 3/7 |
Wes | Modify PrimitiveValueFactory so that iterator returned is sorted alphabetically (to assist testing) | 3/6 | 3/7 | 3/8 |
Wes | update integration plan (add requirement #s for Stage 3 features) | 3/6 | 3/6 | 3/6 |
Apel | Fix returnedData.isPrimitive defect | 3/6 | 3/6 | 3/6 |
Apel | add debug flag to assert class, reroute message to ETA.err stream | 3/6 | 3/6 | 3/6 |
Phil | Perform unit testing on assigned modules | 3/1 | 3/3 | 3/5 |
MikeH | Perform unit testing on assigned modules (pushed back) | 3/1 | 3/8 | |
Jon | Perform unit testing on assigned modules (pushed back) | 3/1 | 3/8 | 3/8 |
MikeP | Perform unit testing on assigned modules (pushed back) | 3/1 | 3/8 | |
Wes | Perform unit testing on assigned modules (pushed back) | 3/1 | 3/8 | |
Apel | Perform unit testing on assigned modules (pushed back) | 3/1 | 3/8 | |
Apel | Write assertion class (follow dr. dobbs example from dalbey's resource page) | 3/1 | 3/3 | 3/3 |
Mike P | Create Software Inspection Procedure document | 2/27 | 3/1 | 3/1 |
Jon | Update Unit Testing Procedure | 3/1 | 3/3 | 3/3 |
ALL | Black Box Testing Homework | 2/27 | 3/1 | 3/1 |
ALL | Inspecting / Testing "party" in lab | 2/27 | 3/3 | 3/3 |
ALL | Prepare for software inspections (reviewers) | 2/27 | 3/3 | 3/3 |
ALL | Code assigned methods due Thursday | 2/27 | 3/1 | 3/1 |
ALL | Code assigned methods due Friday(that are to be inspected Saturday) | 2/27 | 3/2 | 3/2 |
Phil | Implement assigned change proposals (2) | 2/27 | 3/2 | 3/2 |
Mike H | Use JMetric to find methods with cyclomatic complexity > 5 to unit test | 2/27 | 2/27 | 2/27 |
Mike H | Implement assigned change proposal (16 - coding) | 2/27 | 3/2 | 3/7 |
Jon | Update Unit Testing Procedure | 2/27 | 3/1 | 3/1 |
Mike P | Implement assigned change proposals (6 - coding; 12-14) | 2/27 | 3/2 | 3/2 |
Wes | Implement assigned change proposal (1) | 2/27 | 3/2 | 3/2 |
Apel | Update Change Proposals page with who's been assigned to implement which resolutions | 2/27 | 3/1 | 3/1 |
Apel | Update Change Proposals Page with results from last meeting | 2/22 | 2/24 | 2/24 |
Mike H | Continue Mike P's research on having split panes for the application | 2/22 | 2/25 | 2/25 |
Phil | Update User Manual to reflect changes that were approved in last change control meeting (rescheduled to be due Friday after code for change proposals is integrated) | 2/22 | 3/2 | 3/2 |
Phil | Update User Manual with more details about requirements | 2/20 | 2/22 | 2/22 |
Phil | Update Staged Delivery Plan | 2/20 | 2/22 | 2/22 |
Phil | Complete New Staff Document Review | 2/20 | 2/22 | 2/22 |
Phil | Code assigned modules | 2/20 | 2/27 | 2/27 |
Wes | Update Requirements Traceability Matrix (finer level of detail needed) | 2/20 | 2/22 | 2/22 |
Wes | Go through change proposals and update integration plan | 2/20 | 2/27 | 2/28 |
Wes | Contact customer about outstanding change proposals 4, 6, and 11 | 2/20 | 2/22 | 2/22 |
Wes | Code assigned modules | 2/20 | 2/27 | 2/27 |
Wes | Complete New Staff Document Review | 2/20 | 2/22 | 2/22 |
Mike H | Release 2 Recalibration | 2/20 | 2/22 | 2/26 |
Mike H | Revise Detailed Schedule | 2/20 | 2/22 | 2/26 |
Mike H | Code assigned modules | 2/20 | 2/27 | 2/27 |
Mike H | Complete New Staff Document Review | 2/20 | 2/22 | 2/22 |
Mike P | Prepare explanation of code inspection, advise on when it should be done | 2/20 | 2/22 | 2/27 |
Mike P | Complete New Staff Document Review | 2/20 | 2/22 | 2/22 |
Mike P | Code assigned modules | 2/20 | 2/27 | 2727 |
Jon | Update PSP submission procedure | 2/20 | 2/22 | 2/22 |
Jon | Complete programming assignment | 2/20 | 2/27 | 2/27 |
Jon | Complete New Staff Document Review | 2/20 | 2/22 | 2/22 |
Apel | Complete programming assignment | 2/20 | 2/27 | 2/27 |
Apel | Complete New Staff Document Review | 2/20 | 2/22 | 2/22 |
Apel | Code assigned modules | 2/20 | 2/27 | 2/27 |
Phil | Update Visibility info with Mike H, update other managerial pages on web | 2/15 | 2/20 | 2/20 |
Wes | Begin assigning methods for Integration plan stage 3 | 2/15 | 2/22 | 2/20 |
Mike H | Update name tags | 2/15 | 2/20 | 2/20 |
Mike P | Become familiar with Quality Assurance | 2/15 | 2/20 | 2/20 |
Apel | Update web pages to reflect new staff positions, resolution to Change Proposal 12. Remove Software Project Log from home page | 2/15 | 2/22 | 2/22 |
Jon | Update Risks List | 2/15 | 2/22 | 2/22 |
Phil | Complete code walkthroughs (aka code standardization): MethodRowInterface, FieldRow, MethodRow, ParameterRow, ETAViewAbstract | 2/8 | 2/10 | 2/10 |
Phil | Revise line counts so that they are all standardized (ie use FLOCC program) | 2/8 | 2/9 | 2/9 |
Phil | Update User Manual | 2/8 | 2/13 | 2/13 |
Wes | Complete code walkthroughs (aka code standardization): ETA, ObjectPool, ObjectInspector, ReturnThread, ThreadFreeList, and OutputAreaStream | 2/8 | 2/10 | 2/10 |
Wes | Update User Manual | 2/8 | 2/13 | 2/13 |
Wes | Update Requirements Traceablility Matrix | 2/8 | 2/13 | 2/13 |
Wes | Conduct system tests | 2/8 | 2/13 | 2/13 |
Mike H | Complete code walkthroughs (aka code standardization): FieldDataInterface, MethodDataInterface, ParameterDataInterface, ReturnedDataInterface, ParameterDataListener, ReturnedRow | 2/8 | 2/10 | 2/10 |
Mike H | Update prototype in accordance with some of the logged defects | 2/8 | 2/13 | 2/13 |
Mike P | Complete code walkthroughs (aka code standardization): ETAMainModel, FieldData, MethodData, ParameterData, ReturnedData | 2/8 | 2/10 | 2/10 |
Mike P | Update Integration plan | 2/8 | 2/13 | 2/13 |
Mike P | Update build report | 2/8 | 2/13 | 2/13 |
Apel | Complete code walkthroughs (aka code standardization): ETAInspectorView, ETAMainView, RowAbstract, ParameterObjectComboBox, ChangeBackgroundDocumentListener | 2/8 | 2/10 | 2/10 |
Jonathon | Complete code walkthroughs (aka code standardization): InstantiateClassDialog, ConstructorRow, CreatePrimitiveDialog, PrimitiveValueFactory, VisibilityTabbedPane | 2/8 | 2/10 | 2/10 |
Phil | Code assigned methods for Stage 2 | 2/6 | 2/7 | 2/7 |
Phil | Find and fix defects | 2/6 | 2/13 | 2/13 |
Phil | Complete Integration plan line counts | 2/6 | 2/8 | 2/8 |
Wes | Find and fix defects | 2/6 | 2/13 | 2/13 |
Wes | Ask customer about Change Request 6 | 2/6 | 2/8 | 2/8 |
Wes | Code assigned methods for Stage 2 | 2/6 | 2/7 | 2/7 |
Wes | Write test cases | 2/6 | 2/8 | 2/13 |
Mike H | Investigate and implement Change Requests 7 and 9 | 2/6 | 2/8 | 2/8 |
Mike H | Code assigned methods for Stage 2 | 2/6 | 2/7 | 2/7 |
Mike H | Find and fix defects | 2/6 | 2/13 | 2/13 |
Mike P | Investigate impacted methods for Change Request 5 | 2/6 | 2/8 | 2/8 |
Mike P | Find and fix defects | 2/6 | 2/13 | 2/13 |
Apel | Investigate and implement Change Requests 8 and 9 | 2/6 | 2/8 | 2/8 |
Apel | Find and fix defects | 2/6 | 2/13 | 2/13 |
Apel | Code assigned methods for Stage 2 | 2/6 | 2/7 | 2/7 |
Jonathon | Find and fix defects | 2/6 | 2/13 | 2/13 |
Jonathon | Update class diagram | 2/6 | 2/13 | 2/13 |
Jonathon | Revise and update the pseudocode for Stage 3 | 2/6 | 2/13 | 2/15 |
Phillip Hansen | Update line counts and visibility information | 2/1 | 2/6 | 2/6 |
Phillip Hansen | Update the detailed schedule | 2/1 | 2/6 | 2/6 |
Phillip Hansen | Update User Manual screenshots from our current build | 2/1 | 2/6 | 2/6 |
Wes Strickland | Write smoke test and smoke test report format | 2/1 | 2/6 | 2/6 |
Mike Hebron | Investigate the tool JMetric and report on its usefullness | 2/1 | 2/4 | 2/4 |
Mike Hebron | Finish the coding assignments that Jon started | 2/1 | 2/6 | 2/6 |
Mike Power | Meet with Jon to discuss and update Integration Plan | 2/1 | 2/3 | 2/3 |
Apel Yahinian | Conduct Internal System testing on the latest build | 2/1 | 2/6 | 2/8 |
Apel Yahinian | Finalize QA Plan | 2/1 | 2/6 | 2/8 |
Jonathon Lee | Meet with Mike P. to discuss and update Integration Plan | 2/1 | 2/3 | 2/3 |
Jonathon Lee | Update Risks List | 2/1 | 2/8 | 2/8 |
Jonathon Lee | Review design and pseudocode | 2/1 | 2/6 |
|
Phillip Hansen | Code assigned methods | 1/30 | 2/1 |
|
Wes Strickland | Write Test Plan | 1/30 | 2/6 |
|
Mike Hebron | Reorganize menu structure of program | 1/30 | 2/1 |
|
Mike Hebron | Update User Manual | 1/30 | 2/1 |
|
Mike Power | Code assigned methods | 1/30 | 2/1 |
|
Apel Yahinian | Code assigned methods | 1/30 | 2/1 |
|
Jonathon Lee | Code assigned methods | 1/30 | 2/1 |
|
Phillip Hansen | Complete traing survey and mail to Wes | 1/25 | 1/30 |
|
Phillip Hansen | Code assigned methods | 1/25 | 1/30 |
|
Phillip Hansen | Revise Time Accounting Procedure | 1/25 | 1/30 |
|
Phillip Hansen | Revise Visibility info calculations | 1/25 | 1/30 |
|
Wes Strickland | Ask customer to decide about the object inspector | 1/25 | 1/30 |
|
Wes Strickland | Post people's responses to training survey | 1/25 | 1/30 |
|
Mike Hebron | Code assigned methods | 1/25 | 1/30 |
|
Mike Power | Code assigned methods | 1/25 | 1/30 |
|
Mike Power | Assign coding to rest of team | 1/25 | 1/25 |
|
Apel Yahinian | Code assigned methods | 1/25 | 1/30 |
|
Apel Yahinian | Complete training survey and mail to Wes | 1/25 | 1/30 |
|
Apel Yahinian | Revise Unit Development Plan | 1/25 | 1/30 |
|
Jonathon Lee | Re-run JavaDocs on current build and post on web | 1/25 | 1/30 |
|
Jonathon Lee | Code assigned methods | 1/25 | 1/30 |
|
Jonathon Lee | Complete training survey and mail to Wes | 1/25 | 1/30 |
|
Phillip Hansen | Write Team Accounting Procedure | 1/23 | 1/25 |
|
Phillip Hansen | Fill in Visibility information | 1/23 | 1/25 |
|
Phillip Hansen | Revise Detailed Schedule | 1/23 | 1/25 |
|
Phillip Hansen | Revise Action Items Page | 1/23 | 1/25 |
|
Wes Strickland | Update User Manual | 1/23 | 1/24 |
|
Wes Strickland | Write Requirements Traceability Matrix | 1/23 | 1/25 |
|
Mike Hebron | Update Change Control Plan | 1/23 | 1/25 |
|
Mike Hebron | Web Updates (add link to PSP, add JD conding standard link) | 1/23 | 1/25 |
|
Mike Hebron | Formulate required knowledge of trainees for our program | 1/23 | 1/25 |
|
Mike Hebron | Formal Change Control Plan | 1/23 | 1/30 |
|
Mike Power | Write Build Report and Build Procedure | 1/23 | 1/25 |
|
Apel Yahinian | Write Unit Developer Procedure | 1/23 | 1/25 |
|
Jonathon Lee | Revise Staged Delivery Plan | 1/23 | 1/24 |
|
Jonathon Lee | Update Risks List | 1/23 | 1/30 |
|
Phillip Hansen | Revise Deliverables part of Project Plan | 1/18 | Tue 1/23 |
|
Phillip Hansen | Write Stage Delivery Plan and put on web | 1/18 | Tue 1/23 |
|
Wes Strickland | Setup Teamatic | 1/18 | Tue 1/23 |
|
Mike Hebron | Web updates | 1/18 | Tue 1/23 |
|
Mike Hebron | Meeting on Saturday to discuss Staged Delivery and Integration plans | 1/18 | Sat 1/20 |
|
Mike Hebron | Email Phil notes from Saturday's meeting | 1/18 | Tue 1/23 |
|
Mike Power | Meeting on Saturday to discuss Staged Delivery and Integration plans | 1/18 | Sat 1/20 |
|
Mike Power | Start Daily Build process | 1/18 | Tue 1/23 |
|
Mike Power | Write Integration Plan after Saturday's meeting | 1/18 | Tue 1/23 |
|
Apel Yahinian | Revise Quality Assurance Plan | 1/18 | Thur 1/25 |
|
Apel Yahinian | Create schedule to be put on web | 1/18 | Tue 1/23 |
|
Jonathon Lee | Meeting on Saturday to discuss Staged Delivery and Integration plans | 1/18 | Sat 1/20 |
|
Action Items page updated and maintained by Mike Hebron - Project Manager
Last updated 03/13/01