| Date |
Readings |
Training | Project Activity |
Lecture Topic |
|---|---|---|---|---|
| Week 1 | ||||
| Tu 4/1 |
|
Overview of 206 PSP Intro |
||
| Th 4/3 |
|
Stage 0.1 Release Prep |
PSP solutions |
|
| Week 2 | ||||
| Tu 4/8 |
Project
Plan Change Control Plan Template |
#9B Challenge #1 coding |
|
PSP solutions Trac tickets Change Control Staged Delivery |
| Th 4/10 |
QA Plan Test Plan Three Essential Tools (through Automation) Writing System Tests |
Challenge
#1 |
|
Challenge 1 Solution Software Verification |
| Week
3 |
|
|
||
| Tu 4/15 |
Software Inspections | #6A PSP Program 2 |
Distribute Jalopy Tests Manual daily build begins Implementation planning |
Video: Inspections |
| Th 4/17 |
JUnit
readings |
#11 |
System Test Cases due |
|
| Week
4 |
||||
| Tu 4/22 |
Black Box explained | #3A |
Jalopy Tests due |
|
| Tu 4/24 |
Black Box
techniques |
#5A |
||
| Week
5 |
||||
| Tu 4/29 |
#5B | Stage 1 Release |
||
| Th 5/1 |
Midterm Exam1,2 |
|||
| Week
6 |
||||
| Tu 5/6 |
Defect Repair |
#4B | ||
| Th 5/8 |
Automated Sys Tests |
#6B | ||
| Week
7 |
||||
| Tu 5/13 |
Integration Testing |
#3B | ||
| Th 5/15 | Control Structure Tests |
#7 |
Basis Path Example(ppt)
|
|
| Week
8 |
|
|||
| Tu 5/20 |
Basis Path Tests |
#8 | Effective Listening Blocks to Listening |
|
| Th 5/22 |
||||
| Week
9 |
||||
| Tu 5/27 |
No Class - Monday Schedule |
No Class | No Class | No Class |
| Th 5/29 |
Test Coverage Emma tutorial |
|||
| Week 10 | ||||
| Tu 6/3 |
Stage 2 Release | |||
| Th 6/5 |
Project Retrospective | |||
| Finals Week | |
|||
| Th 6/12 |
Self-Evaluation | Final Exam |
Readings are from McConnell text unless otherwise noted.
1QA manager: Costello tutorial due
2Implementation Managers: Ant tutorial due