WORK PRODUCT CHANGE CONTROL SUMMARY


This table summarizes what procedures apply to each project document.
Complete the table by adding all documents in the project.
Work Product Administered By Document
Location

Date
Baselined

Document Category
1.  Vision Statement Project Manager - Bill <url goes here>

Restricted
2.  Top 10 Risks List Risk Manager - Joe

Single Owner
3.  Project Plan Instructor

Process
4.  Change Control Plan Change Control Mgr - Sue

Single Owner
6.  User Manual Analyst - Fred

Single Owner
7.  Software Design: Class Diagram Designer - David

Restricted
8.  Software Design: Javadocs Designer - David

Restricted
9.  Current Defect List All

Public - use Teamatic
  and so on, for all documents  



 

Document History:

2/4/04  JD   Added Document Location and Date Baselined columns
4/1/03  JD   Initial release