Week 4
Tu 10/12
Sir Ned: SRS
Clueless: UI Storyboards Prototype
Null Pointer: QA Plan, CM Plan
Wed 10/13
Clueless: QA Plan, CM Plan
Th 10/14 Sir Ned: QA Plan, CM Plan
Week 5
Tu 10/19 ALL: Feasiblity Requirements approved
Clueless: SRS
Th 10/21
Sir Ned: UI Prototype & Analysis Documents
Null Pointer: SRS
Week 6
Tu 10/26
Th 10/28 Sir Ned: Feasibility Prototype
Null Pointer: UI Prototype
Null Pointer: Feasibility Prototype
Week 7
Tu 11/2 Null Pointer: High Level Design
Th 11/4 Clueless: Proof of Concept Prototype
Week 8
Tu 11/9 Sir Ned: High Level Design
Sir Ned: Stage 1 Implementation scope approved

Clueless: High Level Design
Th 11/11 HOLIDAY
Week 9
Tu 11/16 Sir Ned: Detailed Design
Th 11/18
Week 10
Tu 11/23 Sir Ned: Stage 1 Implementation
Th 11/25 HOLIDAY
Week 11
Tu 11/30 Clueless: Detailed Design
Null Pointer: Detailed Design
Th 12/2