Week 4 | |
Tu 10/12 |
Sir Ned: SRS Clueless: UI Storyboards Prototype Null Pointer: QA Plan, CM Plan |
Wed 10/13 |
Clueless: QA Plan, CM Plan |
Th 10/14 | Sir Ned: QA Plan, CM Plan |
Week 5 | |
Tu 10/19 | ALL: Feasiblity Requirements
approved Clueless: SRS |
Th 10/21 |
Sir Ned: UI Prototype &
Analysis Documents Null Pointer: SRS |
Week 6 | |
Tu 10/26 | |
Th 10/28 | Sir Ned: Feasibility Prototype Null Pointer: UI Prototype Null Pointer: Feasibility Prototype |
Week 7 | |
Tu 11/2 | Null Pointer: High Level Design |
Th 11/4 | Clueless: Proof of Concept
Prototype |
Week 8 | |
Tu 11/9 | Sir Ned: High Level Design Sir Ned: Stage 1 Implementation scope approved |
Clueless: High Level Design |
|
Th 11/11 | HOLIDAY |
Week 9 | |
Tu 11/16 | Sir Ned: Detailed Design |
Th 11/18 | |
Week 10 | |
Tu 11/23 | Sir Ned: Stage 1 Implementation |
Th 11/25 | HOLIDAY |
Week 11 | |
Tu 11/30 | Clueless: Detailed Design Null Pointer: Detailed Design |
Th 12/2 | |